13.00.00 CONTROL & INSTRUMENTATION FOR PLANT AUXILIARY
PACKAGES
13.01.00 Bidder shall provide complete and independent control
and instrumentation system with all accessories
auxiliaries associated equipment and cable for safe,
efficient operation of plant auxiliary system.
13.02.00 Bidder shall include in his proposal all instruments
and devices which are needed for the completeness of
the plant auxiliary system/ equipment supplied by the
bidder, even if the same is not specifically appearing
in specification and measurement shall be to meet actual
system requirement subject to owner’s approval.
13.03.00 Bidder shall provided independent control system for
safe, efficient and reliable operation of plant
auxiliary systems the type of control system shall be as
follows :-
13.03.01 Hot Redundant PLC Based Control without OWS
i) Compressed Air System
ii) Air Conditioning System
13.03.02 Relay Based Control System
i) Fuel oil Handling and Storage System
ii) Ventilation System
iii) Mill Reject Handling System
iv) Miscellaneous Pump
13.03.03 Microprocessor Based
Fire detection and protection system.
13.04.00 The control monitoring operation of all above plant
Aux.System shall be carried out from control panel/desk.
13.05.00 Bidder shall provide all interlock for safe reliable
operation of each plant Aux.system. The protection and
interlock system shall be subject to approval of owner.
13.06.00 Primary Instruments
13.06.01 All instrument used measurement of Hydrogen shall be
intrinsic safe and explosion proof as per NEC Article
500, Class-1, Division-1.
13.06.02 All primary instrument used for measurement of HFO, LDO
shall be flame proof.
13.06.03 The protection Class of all primary instrument shall be
IP 65 or better.
13.06.04 The protection Class of primary instrument installed in
minus floor shall IP 68.
13.06.05 For HT Motors/Important LT Motors command shall be provided
through redundant I/O. The Status of important drive and
HT Motor shall wired in parallel to redundant input module.
13.07.00 Desk / Panel
13.07.01 The control monitoring operation of all plant Aux.system
shall carried out from control panel/desk only. The
control panel shall have mimic diagram, push button
indicators, recorder, indicating lamps selector switch,
control switch, ammeters, voltmeters etc. as per
requirement.
13.07.02 Mimic plate shall be polyester based fiber laminated.
Mimic shall be 7 mm thick.
13.07.03 Painting & Colour Shade
Treatment as per IS-6005. Two coats primer followed by
powder painting with final shade of RAL 7032.
13.08.00 Relay Based Control System
13.08.01 Panel Construction
a) Fabrication from cold rolled stainless steel
b) Frame thickness - 2.00 mm
c) Enclosure thickness - 1.6 mm
d) Gland plate thickness – 3.0 mm
13.08.02 Convention type relay based panel shall be vertical free
standing with hinged doors.
13.08.03 a) Contactors
Electro magnetic air break type
b) Utilization Category
AC – II for AC application
DC – II for DC application
c) Fuse – HRC Cartridge with visual operation indicator
(IS 9224).
13.08.04 Terminal Block - 650 V grade
13.08.05 a) Relay shall have good in plant track record.
b) 20% Spare Relay each type and rating wired up to
terminals.
c) All relay contacts shall be hermitically sealed.
13.08.06 PVC FRLS insulated stranded copper wire meeting the
requirement of VDE 0815.
13.08.07 Control & Switching
2 Nos. of 415 Volts ,3ph supply shall be given which shall be stepped down to 220/110 V for controls. Redundant power pack of 24 V DC shall be provided to energize coupling relays in MCC.
13.08.08 Bidder shall provide Annunciation system, all condition
used for trip shall be provided with pre trip
annunciation in control panel.
13.09.00 PLC Based Control System
13.09.01 Each PLC unit shall be provided with two processor(main
processor unit and memories and one for normal operation
and one as hot standby. Incase of failure of working
processor, there shall be an appropriate alarm and
simultaneous the hot standby processor shall take over
the complete plant operation automatically.
13.09.02 Memory – Programme memory shall be in Non Volatile memory.
13.09.03 PLC shall be time synchronized with DDCMIS/ Master
clock.
13.09.04 A hand held/pc programmer shall be provided for programming
of PLC.
13.09.05 Input/ Output Modules -
a) Input/Output Modules as required in the control system
for all type of field input (4-20 mA, RTD, T/C Digital
contacts etc.) and output from the control system are
to be provided as per requirement.
b) Electrical isolation for 1.5 KV with optical coupler
between the plant input/output and surge protection as per
IEEE 472. c) The hardware design shall be such that it is able to
withstand power line disturbance. The system shall conform
to ANSI/IEEE C 62.4 (Immunity to power supply line disturbance).
d) Bidder shall provide at least 25% spare capacity
available on input, output and CPU, memory modules,
power supply module over and above the system
requirement.
13.09.06 Bidder shall provide built in diagnostic for easy fault
detection.
13.09.07 System shall able to operate in non air conditioned
area.
13.09.08 Bidder may provide Annunciation System as integral
part of PLC. Field contacts shall be acquired through PLC
only. The Annunciation sequence logic shall be implemented
as a part of PLC controllers.
The No.of Annunciation facia windows and provision of
original input will be on as required basis. However,
minimum No.of facia window, signal input to input to
Annunciation System shall be 50 Nos.
13.09.09 Power Supply for PLC System
(a)For PLC, redundant 24 V DC power supply system shall be
provided by bidder. Necessary redundant capacity
charger(2×125% load) 24 V DC, one set of PLANTE Lead
Acid Batteries, shall be provided by bidder. Capacity
of charger shall be sized to meet 100% load requirement
plus recharge the fully discharge battery within 8
(Eight)hours. The batteries shall able to provide back-
up for 1 (one) hours at full load requirement of
complete system.
(b)Bidder shall provide 2×125/capacity redundant power
supply module/ card required for PLC cabinet.
13.09.10(a)Contractor shall provide current Transducer for HT or important motors current measurement(4-20 mA)
(b)Bidder shall provide 32 Nos. of potential free
binary and eight No. of 4-20 mA Analog signals from each
plant auxiliary system for monitoring of important
parameter to DDCMIS. Bidder shall provide necessary
interface hardware for inter connection of each plant.
However exact No. shall be decided during detail Engg.
13.09.11 Grounding
Bidder shall provide electronic grounding for PLC which
shall be separate from Electrical grounding as per IS or IEEE Standard.
13.10.00 All important tripping in plant auxiliary shall be from
2 out of 3 sensor.
13.11.00 All instrument required for performance guaranty test of
plant Aux. system, shall be in the scope of bidder.
13.12.00 Bidder shall provide redundant data bus, communication
processor.
13.13.00 Tests
13.13.01 Factory Acceptance Test
(i) P L C
a) Hardware & Software as per BOM
b) Spare capacity in cabinet for new module
c) Current & Power Consumption
d) Power Failure Test
e) Healthiness of Hardware/all module
f) On line removal of I/O card
g) Accuracy Test
h) Diagnostic Test
i) Functional Test
j) Verification of Software
k) Redundancy Test of Controller
l) Redundancy Test of power supply
m) CPU loading duty cycle
n) Power failure auto restart
Any other Test as per QAP
(ii) Safety Instrumentated Systems (SIS)
The factory acceptance test for SIS shall be conform to
IEC-61511 – 1 – Clause No.13.
13.13.02 TYPE TEST
Contractor shall submit following Type Test report for
review.
(i) Surge with stand capability (SWC)
(ii) Dry Heat Test (IEC-68.2.2)
(iii)Dump Heat Test(IEC-68.2.3)
(iv) Vibration Test(IEC-68.2.8)
(v) EMC Test (IEC-61000.4.2)
13.13.03 Bidder shall submit following documentation along with
factory test for review.
(a) Internal test report along with heat run test
(Temperature elevated test – 48 Hrs. at 50 Deg.C)
(b) Calibration certificate of measuring instruments.
13.13.04 Installation, Commissioning, verification, Prestartup test
at site for Safety instrumented system shall be as per
ISA 84.01.